Safety
 
COST
HY.
TR. MRL
NOTES
»
Speed 0 2 1 Very easy rescuse of Trapped passanger is avilable in Hydraulic
»
Rescuse 2.5 0.5 0  
»
Safety-Maintence 2.0 1.0 05  
»
Safety Running

1.5

1.0 0.5  
»
Resistance to Quakes 3.0 0 0  
»
Saftey Points % ile 9.0
75
2.5
21
1.5
4
= 12 points
= 100 %
 
                                              Earthquake
 
COST
HY.
TR. MRL
NOTES
»
Energy Consumption 0 1 2 During Operation
»
Installation Cost 2 0 1  
»
Service Cost 2 1 0  
»
Client Dependency

1.5

1.5 0  
»
Services Requirement 2 0 1  
»
Environment Freindliness 0 1 2 Oil leakages reduce the friendlness of the Hydraulic slightly even though systems are built to prevent leakages.
»
Cost Point % ile 7.5
42
4.5
25
6
33
18 points
100 precentile
»
Noise in the Shaft 1 1 1  
»
Machine Room Dependency 1 0 2 Location+Necessity. MRL scores as no Machine Room is required however a heigher overhead is required
»
Total Points 18.5
47
10
26
10.5
27
39
100 Percentile
                                                Comparision - Earthquake
»
Massive Inertia loads set in motion through building sway combined with the heavy counter-weights – potential excessive damage & injury
»
Reduced inertia loads and carried by the foundation of the building – reduced damage & injury by a Factor of 10 to 1
                                                Comparision - Fire
»
l Access to the top floor or the shaft inside becomes difficult, time consuming and release of the brake may cause the car to go up instead of down.
»
l Access to the Machine room can be suitably designed and lowering is possible with a press of a button and with a hand pump made to move up.
 
   
 
Power Consumption
   
Less
More

» Power Consumed in upward direction only

 
» power consumed in both the direction
   
Construction Cost
   
Less
Heigh
» Flexible & small machine room   » Overhead & machine room required
» No channels required in the machine room   » Channels required to fix the machine
» Only one load bearing wall required   » Load bearing walls on all sides required
» Less pit depth is required   » More pit depth is required
     
tiEasy and Fast Installaon
30 Days   » 60 Days